GENERAL CONSTRUCTION Construction of Main Access Road (MAR) from first roundabout till second roundabout and widening of the North Cargo Road (NCR), for an approximate length of 2 km each and carry out associated infrastructure work. Project is undertaken such that no disturbance shall be caused to the moving traffic between Trumpet interchange and Airport...
GENERAL CONSTRUCTION Construction of Flyover along Chord road at 10th Cross Junction in Rajajinagar 1st block, ward No.67, Outcomes and achievements: • This Flyover serves to divert the traffic from entering the at grade road to reduce the traffic jams. • The Flyover do not intercept the existing road, but it provides a parallel passage...
GENERAL CONSTRUCTION Earthwork in formation construction of Bridges and Permanent work for Railway siding and Marshelleing yard for the portion of work outside the compound wall of YTPS upto takeoff point near Yermarus railway station for Yermarus Thermal Power station(YTPS-200X800MW) near Yermarus village Raichur District Karnataka. Outcomes and achievements: • We have done Earthwork in...
CONSTRUCTION OF GRADE SEPARATOR AT HUNSUR ROAD AND ORR JUNCTION IN MYSORE CITY. This is the first flyover in Mysuru City and on a crucial road that links Mysuru to Kodagu and Dakshina Kannada. Outcomes and Achievements: 1. Movement of vehicles on service roads smooth. Mysuru: The much-awaited city’s first flyover at the Hinkal Junction...
GENERAL CONSTRUCTION Design and Construction of Flyover on ORR connecting Nagawara and Veerannapalya flyovers with dedicated Entry and Exit ramps and associated works for Manyata Tech Park, Bengaluru. The flyover is mainly constructed to reduce traffic congestion alleviation at Manyata Tech Park Entrance and Exit. Outcomes and achievements: 1. The flyover has reduced the traffic...
GENERAL CONSTRUCTION The Underpass at Kuvempu Circle and BEL Circle on ORR was constructed by Bangalore Development Authority with the aim of reducing traffic congestion on the NH 7 on the eastern side and NH 4 in the western side. Outcomes and achievements: Kuvempu Circle and BEL Circle were the most important and busiest junctions...
Construction of Flyover along ORR at Doddanekundi Junction (Ch.22.60km), Bengaluru The Flyover at Doddanekundi along ORR was constructed by Bangalore Development Authority with the aim of reducing traffic congestion on the Outer Ring Road arising from the Bagmane World Technology Centre (IT Park). Outcomes and achievements: 1. The Doddnekundi Flyover, which was built served the...
ROAD CONSTRUCTION Construction of 6 lanes South Secondary Access Road to Kempegowda International Airport, Bengaluru. It is an alternate access to the Terminal 1 and would be approximately 3 km in length. Outcomes and achievements: New terminal approach and temporary approach to existing terminal T1. Development and construction of Southern Access Road (SAR) between intersection...