11, 3rd FLoor, Ajantha Hotel Rd, MG Road,
Craig Park Layout, Ashok Nagar, Bengaluru, 560001
Mon - Sat 9.30 - 6.00 Pm
Sunday CLOSED

AUGMENTATION OF COACHING FACILITIES FOR INTERMEDIATE OVERHAULING MAINTENANCE (PHASE-II) (TWO PACKET SYSTEM).

  • Posted by: givick
  • Category: News

AUGMENTATION OF COACHING FACILITIES FOR INTERMEDIATE OVERHAULING MAINTENANCE (PHASE-II) (TWO PACKET SYSTEM).

Outcomes and achievements:
1. IOH (Intermediate Overhauling) Shed of size 105.00mX38.00m for Coaches Repairing & Maintenance.
2. Pit line four numbers of 35.00 m length.
3. Single Storey Building of size 10.00mX10.00m for Wash rooms.
4. Track Linking 5 lines of 300.00m.
5. Gantry Girders for 60Tons two numbers of EOT Cranes.
6. Self-Supported Roof of size 105.00mX 18.00m for two Bays.
7. Landscape & Vehicle Parking Shelters.
Key facts:
• Client: South Western Railway (Construction)
• Location: Railway Station, Mysore.
• Period: 2019 – 2022 (In Progress)
• Executed Value: Rs. 12,00,08,052.00/-

PJB Role:

We have executed the work as prime contractor and as per client requirement. In this project we have executed Earthwork, Track linking, CC Aprons, Pit lines, Steel Structures, Toilet Building, Concrete work PCC, RCC-M25, M30, M35, Waste water and Storm water drains, reinforced steel, Vacuum Dewatering Floor.

Client Details
South Western Railway,
Mysore, Karnataka – 570 020.

Author: givick